UNAVCO 1996 Annual Report
[Next] [Previous] [Up] [Contents]

2.7 Direct Project Support for FY97


Tables 2-9, 2-10, 2-11, and 2-12 show the present level of Boulder Facility support to be provided to either NSF-funded investigators or under the "Community Support" role in FY97. The field engineer and/or equipment support hours shown in the Tables represent only the time spent in direct support of the specific projects listed. These Tables are updated during the year on a quarterly basis to include newly-funded projects.

Table 2-9: NSF-EAR Direct Field Project Support for FY97

Project PI Field Dates
Planned field engineering effort/ Equipment effort
(staff weeks)
NSF-EAR Funding Agency
Proposal Number
Program Director
Nepal Bilham Nov-Dec 96 1.5 / 0
NSF-EAR-Geophysics
# requested
Dr. Robin Reichlin
Eastern Mediterranean Reilinger July 96- ongoing 4.0 / 6.0
NSF-EAR-Geophysics
EAR-9304554
Dr. Robin Reichlin
Basin and Range
Phase II installation
Includes summer 97 maintenance trip
Wernicke

Davis

ongoing 13.0 / 2.5
NSF-EAR-Continental Dynamics
EAR-9418784
Dr. Leonard F. Johnson
Tien Shan/Kyrgyzstan

Tien Shan/China

Hager 24 April - 15 October 97

1 June - 15 July

1 Sept - 15 Oct

20.0 / 10.0
NSF-EAR-Continental Dynamics
EAR-9614302
Dr. Leonard F. Johnson
Interior Alaska Freymueller 14 July -

4 Aug 97

6.0 / 0.0
NSF-EAR-Geophysics
EAR-9706318
Dr. Robin Reichlin
PANGA Miller 28 July -

25 Aug 97

6.0 / 0
NSF-EAR-IF
EAR-9615640
Dr. Daniel F. Weill
NSF-EAR-Geophysics
EAR-9614365
Dr. Robin Reichlin

Table 2-10: NSF-EAR Agent Project Support for FY97

Project PI Field Dates Planned field engineering effort/ Equipment effort

(staff weeks)

NSF- EAR Funding Agency
Jalisco Block DeMets / Stock Sanchez Jan. 1997 0 / 1.5
NSF-EAR-Geophysics
EAR-9526419
Dr. Robin Reichlin
In Situ Measurements in Active Fault Zones Agnew 17 Feb -

21 April 97

0 / 1.0
NSF-EAR-Geophysics
EAR-9528113
Dr. Robin Reichlin
Kinematic Continental Collision Bilham 21 Mar -

7 June 97

0 / 0.20
NSF-EAR-Geophysics
# requested
Dr. Robin Reichlin
Quanterra-GPS

Integration Development

Meertens 1 April 97 -

1 April 98

Estimated staff effort at 15 weeks.
NSF-EAR-IF
UNAVCO Facility Activity
Dr. Daniel F. Weill
Siberia Hydrology Hinzman 20 April - 15 June 97 0 / 1.0
NSF-EAR-Hydrology
EAR-9614387
Dr. L. Douglas James
Altyn Tagh - China McNutt 1 May -

1 October 97

0.8 / 1.0
NSF-EAR-Geophysics
pending
Dr. Robin Reichlin
Bulgaria - Recon

 

Bulgaria - Project

Burchfiel King 15 June - 30 July 97

15 Aug - 10 Oct 97

0 / 2.1
NSF-EAR-Active Tectonics
EAR-9628225
Dr. Thomas O. Wright
White/Inyo Range Tikoff 7 - 21 July 97 0.0 / 1.5
NSF-EAR-Petrology and Geochemistry
Dr. Maryellen Cameron

Table 2-11: NSF Other than EAR Support for FY97

Project PI Field Dates Planned field engineering effort/ Equipment effort

(staff weeks)

NSF Other Than EAR
Funding Agency
Globe GPS Support Meertens ongoing 0 / 0.40 staff years Separate funds to facility. NSF - multi-agency via UCAR
Antarctica NSF Oct 96 - Feb 97 1.25 staff years / 8 weeks
Separate funds to facility.
NSF-OPP
Dr. Scott Borg
Montserrat Island Mattioli 11-21 Nov 96 10.5 / 0
NSF-RUI-Instrumentation
EAR-9628553
 
NSF-EHR-MRCE
HRD-9353549
 
NSF-ARI
ATM-9209181
Peatland Bogs Glaser 6 June- 1 Sept 96 4.0 / 3.5
NSF-DEB-Ecosystem Studies
DEB-9215429
Dr. Taber D. Allison
Cooperative Ice Core Hamilton 17 July - 27 Oct 97 0 / 1.0
NSF-ATM Climate and Dynamics
Dr. Jay Fein

Table 2-12: Community Support for FY97

Project PI Field Dates Planned field engineering effort/ Equipment effort

(staff weeks)

Wasatch Meertens 7 - 21 January 97 1.0 / 0
So. California Survey Reilinger 26 Feb. - 21 March 97 0 / 0.50
UC Santa Cruz Silver 10 March - 14 April 97 0 / 0.05
Louisiana Data Collection Dixon 11 March - 23 April 97 0 / 1.20
Puerto Rico Dixon 14 - 21 March 97 0.5 / 0
Antarctic Ice Streams Herzfeld 18 April -15 July 97 0 / 0.50
U. Alaska CR Antenna Tests Freymueller 25 April - 5 June 97 0 / 0.05
CU Aerospace Engineering Student Thesis Support Gifford 28 April - 27 May 97

0 / 1.0

Wabash Valley Hamburger 1-31 August 97
2 SSIs w/choke-rings
GPSurvey key
CU Choke-ring Antenna Tests Axelrad 29 Apr - 12 May 97

Choke-ring antenna

CU - Larson K. Larson 8 Apr. - 5 May 97

1 TR

Choke-Ring Antenna Tests Freymueller 25 Apr - 5 June 97

2 choke-ring antennas

Along with the projects listed above requiring equipment and Facility staff support, the Data Acquisition Group will allocate resources to make improvements to continuous station support for FY97. Substantial resources were invested in FY96 to identify and design the necessary hardware for installing and supporting continuous stations. The focus for FY97 is to invest in the remote download software necessary for robust long term operation on a variety of platforms in a variety of communication situations.

Trimble Navigation plans a summer 1997 release of their R-Utilities software on various UNIX-based operating systems including SUN Solaris, Intel Solaris, and Linex. A new release of the UNAVCO download software will utilize these new tools and run on both SUN Solaris and Intel Solaris operating systems.The new remote download software, written by Field Engineer Dave Mencin, is called Local Automated Procedure for Downloading Operational GPS Data (LAPDOGS). A DOS-based remote data download and backup system, called the Automated Download Program (ADP), written by Deborah Martin, will also be released during the summer of 1997. FY98 plans include combining of LAPDOGS with JPL's TurboRogue download software (GNEX) on Linex platform. A long term goal is to also integrate an Ashtech download capability on these same platforms, once Ashtech provides support to UNIX-based downloading.


1996 Annual Report - 23 SEP 1997

[Next] [Previous] [Up] [Contents]